  1. effective embedment depth of anchor | Eng-Tips

    2023年6月15日 · In ACI 318-14 chapter 17 effective embedment depth (hef)is used in equations to determine concrete breakout strength for a single anchor in tension, and for anchor groups. …

  2. Anchor Minimum Embedment Depth | Eng-Tips

    2013年8月12日 · Is there a guide to minimum embedment depth for anchors? I have 1" anchors that are only used to resist shear with no tension (equipment support on slide plates). What …

  3. Embedment/Extension of Piles into the Pile Cap... | Eng-Tips

    2005年11月17日 · I posted this in the Marine/Ocean Engineering forum, but no one was biting... I'm looking into rules/requirements for just how much a pile should extend into its pile cap. The …

  4. Guidance for Doweling new concrete to existing concrete section

    2002年7月3日 · For a #6 bar this equates to 21 inch embedment depth. If I use ESR-2508 (Table 5B - Set-XP Epoxy Adhesive Anchor Rebar Bond Strenght Design Information), for a #6 bar, the …

  5. Understanding ACI 318-19 - Rebar as Anchorage | Eng-Tips

    2025年2月12日 · I have a couple of questions on one of the provisions that has been added in ACI 318-19. The clause on 17.1.6 states: Reinforcement used as part of an embedment shall have …

  6. epoxy dowel embedments? | Eng-Tips

    2007年9月14日 · I am working on a project where the plans specify epoxy dowel installation according to ICBO ER-5193 (also allows for Simpson SET). My question is, is there a standard …

  7. Post embedment | Eng-Tips

    2006年11月8日 · I have a question on post embedment in a concrete drilled shaft/caisson. I am doing a soundwall design where the soundwall posts are prestressed concrete in the shape of …

  8. Anchor bolt embedment depth | Eng-Tips

    2010年1月8日 · This is probably a dumb question, but is there a simple rational method to determine the required depth of embedment for a single headed anchor bolt in normal …

  9. Development Length with Dilled and Epoxyed Rebar | Eng-Tips

    2011年9月13日 · Should I extend the doweled rebar equal to Concrete Cover + Ldh (hook development length) + embedment for epoxy anchoring, or is it sufficient to dowel it just the …

  10. Anchor Bolt Embedment | Eng-Tips

    2008年6月3日 · I am trying to find the calculation to figure out the minimum embedment needed. A project of ours has had the foundations poured and the GC noticed that all the Anchorbolts …